Wholesale China Air Duct Board Insulation Factory Quotes – Polyurethane (PU) Foam Pre-Insulated HVAC Ductwork Panel – ZDW

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Always customer-oriented, and it's our ultimate target to be not only the most reliable, trustable and honest supplier, but also the partner for our customers for Pre Insulated Air Duct Panel Phenolic Foam , HVAC System Air Duct Panel , Phenolic Foam Board With Aluminum Foil Coated , We welcome new and old customers from all walks of life to contact us for future business relationships and mutual success!
Wholesale China Air Duct Board Insulation Factory Quotes – Polyurethane (PU) Foam Pre-Insulated HVAC Ductwork Panel – ZDW Detail:

Advantage

Light , fireproofing , not buring in the naked light ,smoke-free ,harmless ,no dripping , widely temperature used (-196~+200),have aquired National Fireproofing Materials Quality Supervation center GB8624-1997,firegroofing and non-combustible A standard ,certificate emission E1 standard(can be use in the room directly ),according with the green environmental protection requirements .

Compared with traditional galvanized Iron ( steel metal) ductwork, PU Foam Pre-insulated Duct Panel with Aluminum Foil have offers a high performance, light weight and robust system that requires only a single fix installation process. It is widely used in the ventilation systems of central air conditioning units in hospital, hotel, market, supermarket, guesthouse, airport, stadium, workshop, food store, pure project and so on.

Technical Data

 Standard Size 3950×1200×20mm±1mm3950×1200×25mm±1mm3950×1200×30mm±1mmCan cut as the customer’s requirement
 Foam Density  50 kg/m3
 Aluminum foil thickness  0.08mm/0.2mm
 Thermal Conductivity  0.02W/m.k
Aluminum Color Silver
 Compressive Strength  0.25MPa
 Bending Strength  2MPa
 Water Absorption  0.1%
 Dimension Change  0.3%
 Maximum Wind Velocity  13-20m/s
 Maximum Running Temperature  70 ℃

PU Foam Pre-insulated Air Conditioning Duct Panel will be packed as below details:
1. 40′HQ Container: 3950/2950*1200*20mm, 10 sheets packed in one carton, total 660sheets(3950mm) / 880sheets(2950mm).
2. 20′GP Container: 2900*1200*20mm, 10 sheets packed in one carton, total 400sheets.

FAQ

Q1: How can I contact salesman?
A1: Please send inquiry or send email to us.
Q2: How can I buy products in your country?
A2: Please send us an inquiry or email, we will reply to you and send you a trade assurance order if you need.
Q3: How long does it take to get the product if I place an order
A3: With the process of your requirements, we will pack and deliver in 5-7 days. If it is by sea shipment, it will take 15-45 days depending on different locations.


Product detail pictures:

Wholesale China Air Duct Board Insulation Factory Quotes –  Polyurethane (PU) Foam Pre-Insulated HVAC Ductwork Panel  – ZDW detail pictures

Wholesale China Air Duct Board Insulation Factory Quotes –  Polyurethane (PU) Foam Pre-Insulated HVAC Ductwork Panel  – ZDW detail pictures

Wholesale China Air Duct Board Insulation Factory Quotes –  Polyurethane (PU) Foam Pre-Insulated HVAC Ductwork Panel  – ZDW detail pictures

Wholesale China Air Duct Board Insulation Factory Quotes –  Polyurethane (PU) Foam Pre-Insulated HVAC Ductwork Panel  – ZDW detail pictures

Wholesale China Air Duct Board Insulation Factory Quotes –  Polyurethane (PU) Foam Pre-Insulated HVAC Ductwork Panel  – ZDW detail pictures

Wholesale China Air Duct Board Insulation Factory Quotes –  Polyurethane (PU) Foam Pre-Insulated HVAC Ductwork Panel  – ZDW detail pictures


Related Product Guide:

Our goal is to provide high quality products at competitive prices, and top-notch service to customers around the world. We are ISO9001, CE, and GS certified and strictly adhere to their quality specifications for Wholesale China Air Duct Board Insulation Factory Quotes – Polyurethane (PU) Foam Pre-Insulated HVAC Ductwork Panel – ZDW , The product will supply to all over the world, such as: Canada, Barcelona, Algeria, Look forward to the future, we'll focus more on the brand building and promotion . And in the process of our brand global strategic layout we welcome more and more partners join us, work together with us based on mutual benefit. Let's develop market by fully utilizing our in depth advantages and strive for building.
  • The supplier abide the theory of "quality the basic, trust the first and management the advanced" so that they can ensure a reliable product quality and stable customers.
    5 Stars By Lisa from St. Petersburg - 2017.08.28 16:02
    It is really lucky to meet such a good supplier, this is our most satisfied cooperation, I think we will work again!
    5 Stars By Julie from Curacao - 2018.12.11 14:13
    Write your message here and send it to us