Wholesale China Pre Insulated Duct Board Factories Pricelist - Polyurethane (PU) Foam Pre-Insulated HVAC Ductwork Panel - ZDW | zdw insulation
Wholesale China Pre Insulated Duct Board Factories Pricelist - Polyurethane (PU) Foam Pre-Insulated HVAC Ductwork Panel - ZDW | zdw insulation Detail:
Advantage
Light , fireproofing , not buring in the naked light ,smoke-free ,harmless ,no dripping , widely temperature used (-196~+200),have aquired National Fireproofing Materials Quality Supervation center GB8624-1997,firegroofing and non-combustible A standard ,certificate emission E1 standard(can be use in the room directly ),according with the green environmental protection requirements .
Compared with traditional galvanized Iron ( steel metal) ductwork, PU Foam Pre-insulated Duct Panel with Aluminum Foil have offers a high performance, light weight and robust system that requires only a single fix installation process. It is widely used in the ventilation systems of central air conditioning units in hospital, hotel, market, supermarket, guesthouse, airport, stadium, workshop, food store, pure project and so on.
Technical Data
| Standard Size | 3950×1200×20mm±1mm3950×1200×25mm±1mm3950×1200×30mm±1mmCan cut as the customer’s requirement |
| Foam Density | 50 kg/m3 |
| Aluminum foil thickness | 0.08mm/0.2mm |
| Thermal Conductivity | 0.02W/m.k |
| Aluminum Color | Silver |
| Compressive Strength | 0.25MPa |
| Bending Strength | 2MPa |
| Water Absorption | 0.1% |
| Dimension Change | 0.3% |
| Maximum Wind Velocity | 13-20m/s |
| Maximum Running Temperature | 70 ℃ |
PU Foam Pre-insulated Air Conditioning Duct Panel will be packed as below details:
1. 40’HQ Container: 3950/2950*1200*20mm, 10 sheets packed in one carton, total 660sheets(3950mm) / 880sheets(2950mm).
2. 20’GP Container: 2900*1200*20mm, 10 sheets packed in one carton, total 400sheets.
FAQ
Q1: How can I contact salesman?
A1: Please send inquiry or send email to us.
Q2: How can I buy products in your country?
A2: Please send us an inquiry or email, we will reply to you and send you a trade assurance order if you need.
Q3: How long does it take to get the product if I place an order
A3: With the process of your requirements, we will pack and deliver in 5-7 days. If it is by sea shipment, it will take 15-45 days depending on different locations.
Product detail pictures:
Related Product Guide:
Our primary objective is always to offer our clients a serious and responsible small business relationship, offering personalized attention to all of them for Wholesale China Pre Insulated Duct Board Factories Pricelist - Polyurethane (PU) Foam Pre-Insulated HVAC Ductwork Panel - ZDW | zdw insulation , The product will supply to all over the world, such as: Jordan, Indonesia, Nairobi, We adopted technique and quality system management, based on "customer orientated, reputation first, mutual benefit, develop with joint efforts", welcome friends to communicate and cooperate from all over the world.
The factory workers have rich industry knowledge and operational experience, we learned a lot in working with them,we are extremely grateful that we can encount a good company has excellent wokers.



